Free Bill of Quantities (BOQ) Template

A Bill of Quantities (BOQ) is an itemized list of the materials, labour and work sections needed to complete a construction project, each with a unit of measurement, a quantity, and (once priced) a rate and amount. It's the backbone of tendering — contractors price the same BOQ to produce comparable bids — and it stays in use through the project, feeding payment certificates and progress valuations. Below is a worked example for a small building, followed by a step-by-step guide to preparing one.

Sample — residential building BOQ
ItemDescription
A — Substructure
A.1Excavate foundation trench
A.2Mass concrete blinding, grade 10
A.3Reinforced concrete strip footing, grade 25
Subtotal — Substructure6,482.50
B — Superstructure
B.1150 mm sandcrete blockwork walling
B.2Reinforced concrete columns, grade 25
B.3Reinforced concrete roof slab, 150 mm
Subtotal — Superstructure16,150.00
C — Finishes
C.1Cement-sand plastering, internal and external
C.2Ceramic floor tiling
Subtotal — Finishes8,160.00
Grand total carried to summary30,792.50

How to prepare a bill of quantities

  1. 1Break the works into logical sections — e.g. substructure, superstructure, finishes, external works — matching how the project will actually be built and measured.
  2. 2Take off quantities from the drawings and specification for every item ('quantity take-off'): lengths, areas, volumes or counts.
  3. 3Assign a standard unit of measurement to each item — m, m², m³, kg, no., sum/LS — following a recognized standard method of measurement where one applies.
  4. 4Write a clear, unambiguous description for each item, including material, grade/spec and any finish, so every bidder prices the same scope.
  5. 5For a tender BOQ, leave the rate and amount columns blank for contractors to price; for an internal estimate, insert your own rates.
  6. 6Subtotal each section, then sum all sections to a grand total carried to the tender/contract summary.
  7. 7Once awarded, the same BOQ becomes the pricing basis for valuing work executed — it feeds directly into progress reports and interim payment certificates.

Frequently asked questions

What is a Bill of Quantities (BOQ)?
A BOQ is an itemized list of a project's measured work — descriptions, units and quantities — used to obtain comparable tender prices and, once priced, to value and pay for work as it's completed.
Who prepares a BOQ?
Typically a quantity surveyor or estimator, working from architectural and engineering drawings and the project specification, following a standard method of measurement.
What's the difference between a BOQ and a Bill of Materials?
A BOQ measures construction work items (e.g. '150 mm sandcrete blockwork, 310 m²'), including labour and materials together. A Bill of Materials lists only the physical materials and components needed, without the measured-work framing.
Do I need software to prepare a BOQ?
No — a BOQ can be built in a spreadsheet. Software helps once you need consistent section totals, version control across tender revisions, and a direct link from the priced BOQ into payment certificates and progress valuation.
Can a BOQ be generated automatically?
Increasingly yes — describing the works in plain language (e.g. "elevated steel water tank, septic tank, pump house") can produce a structured, sectioned BOQ draft that a quantity surveyor then reviews and prices.

Draft a BOQ in minutes, not hours

Describe the works in plain language and Planovera's AI drafts a complete, sectioned BOQ for you to review and price. Built-in Excel paste/import, subtotal and grand-total rows, and the same figures flow straight into payment certificates and progress reports.

No credit card required

Related templates